Estimating construction costs and schedules : experience with power generation projects in developing countries Robert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian

By: Material type: TextTextLanguage: English Series: World Bank technical paper . Energy series | . no. 325 Publication details: World Bank; Washington, D.C.; 1996Description: xv , 120 p. : ill. ; 28 cmISBN:
  • 0821336703
Subject(s): LOC classification:
  • TK1193.D44B33 1996
Item type: PRINT
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

Includes bibliographical references (p. 119-120)

There are no comments on this title.

to post a comment.